Welded or Cast GIS Enclosures: Fabrication and Inspection Choices
Choose enclosure construction from geometry, material and batch needs, then agree weld, dimensional, pressure and leak-test acceptance.

Customized welded enclosures and housing assemblies for Gas-Insulated Switchgear (GIS), manufactured to customer drawings and technical specifications.
Quote against approved manufacturing drawings and inspection criteria.
IEC 62271-203 addresses the complete AC GIS assembly; enclosure acceptance is drawing and project-specification specific.
EONOVA – Your Reliable Sourcing Partner for GIS Components from China. Share your drawings and technical specifications so that material selection, welding fabrication, machining and inspection requirements can be coordinated with manufacturing partners.
| Parameter | Value |
|---|---|
| Voltage Range | 72.5–800 kV |
| Product Name | GIS Welded Enclosures / GIS Fabricated Tank |
| Design Basis | Customer drawings and technical specifications |
| Configurations | Cylindrical housings and multi-port welded structures / |
| Connection Interfaces | Flanged connections and precision-machined interfaces / |
| Materials and Fabrication | Options subject to design requirements |
| Quality Support | Quality inspection and technical documentation |
Enclosure dimensions, openings, flange interfaces, materials, welding and inspection requirements are confirmed against customer drawings and technical specifications.
Authentic manufacturing photography documenting EONOVA GIS welded tank assembly, 5-axis CNC flange milling, internal weld seam smoothing, and sealed packaging.

High-precision 3-roller CNC bending roll regulating roundness and curvature for ultra-large diameter GIS enclosures.

Multi-axis rotary positioner with inert gas shielding ensuring dense, slag-free, full-penetration circumferential welds.

Floor-type 5-axis CNC horizontal boring machine precision-milling multi-port flange faces and O-ring grooves to IT6 tolerance.

Heavy-duty CNC lathe turning flange spigots and sealing surfaces with Ra 0.8 roughness for extreme vacuum gas-tightness.

Agree radiographic inspection coverage, record retention and acceptance criteria for pressure-bearing welds.
Prepare your enclosure drawings and technical specifications so the configuration, manufacturing approach and quotation can be confirmed.

Choose enclosure construction from geometry, material and batch needs, then agree weld, dimensional, pressure and leak-test acceptance.

Review material, mechanical duty, insulation clearance, connection drawings and qualification tests for GIS insulating tubes and rods.