
OIP or RIP Transformer Bushing: What Should Buyers Check?
Compare oil and dry-core construction, mounting, maintenance and model-specific IEC 60137 test evidence before choosing a transformer bushing.

Gas-insulated composite bushings for 72.5kV to 800kV GIS switchgear, featuring explosion-proof ductile composite housings, optimized field shielding, and maintenance-free reliability.
Confirm GIS voltage class, air-side hollow composite insulator parameters, conductor interface, and gas sealing criteria.
Governed by IEC 60137, IEC 62271-203, GB/T 4109 and GB/T 7674 for gas-insulated apparatus bushings.
EONOVA provides bespoke engineering and sourcing support for 72.5kV to 800kV gas-insulated composite bushings matched to OEM switchgear interfaces (Sieyuan, Pinggao, Toshiba, XD, TBEA, Taikai, Mitsubishi), custom creepage, extreme temperature, and high-seismic site specifications.
| Parameter | Specification |
|---|---|
| Rated Voltage Class | 72.5 kV ~ 800 kV (72.5, 126, 145, 252, 363, 550, 800 kV) |
| Rated Current | 2000 A ~ 5000 A |
| Insulating Medium | SF6 (Sulphur Hexafluoride) / Eco-friendly insulating fluorogas mixtures |
| Insulator Housing | FRP Hollow Tube + Injection-Molded HTV Silicone Rubber Sheds |
| Partial Discharge (PD) | ≤ 5 pC at 1.05 Um / √3 |
| Creepage Distance | Class e (≥ 31 mm/kV) / Very Heavy Pollution, or custom class d (≥ 25 mm/kV) |
| Annual Gas Leakage Rate | ≤ 0.1% per year (Helium mass spectrometry leak tested) |
| Cantilever Withstand Load | 3.0 kN ~ 12.0 kN (depending on voltage rating and tube length) |
| Seismic Withstand Level | AG5 (0.5g ground acceleration / 9-degree seismic withstand) |
| Operating Temperature | -50 °C ~ +55 °C (Extreme cold & tropical desert compatible) |
| Applicable Standards | IEC 60137, IEC 62271-203, GB/T 4109, GB/T 7674 |
Dimensions, interfaces and replacement compatibility require approved drawings and technical review.
Lightweight composite structure: weight reduced by over 50% compared with conventional porcelain, significantly reducing mechanical stress on GIS tanks and substation structures.
Excellent vandalism & explosion resistance: ductile composite housing prevents brittle fracture and fragment scattering under extreme internal arcing or shock, safeguarding personnel and equipment.
Superior pollution flashover resistance: HTV silicone rubber sheds offer excellent hydrophobicity and hydrophobicity transfer, eliminating manual washing in coastal salt-fog and heavy contamination.
Reliable gas sealing design: high-integrity dual sealing surfaces and precision-machined interface flanges ensure ultra-low annual leakage rates far superior to standard limits.
Optimized electric field distribution: computer-modeled shielding electrodes and grading rings deliver smooth voltage gradients and exceptionally low partial discharge across all operating duties.
Excellent seismic resilience & maintenance-free lifecycle: flexible construction withstands high seismic accelerations with zero scheduled maintenance throughout its service life.
High-strength continuous filament-wound epoxy fiberglass tube lined with high-temperature vulcanized (HTV) silicone rubber sheds with exceptional hydrophobic retention and flame-retardant rating.
High-conductivity electrolytic copper or aluminum alloy tubular conductor with silver-plated or tin-plated contact surfaces, engineered for continuous currents up to 5000A with minimal thermal rise.
Precision-formed, polished aluminum shielding electrodes optimizing electric field transition between GIS ground enclosure and high-voltage live conductor.
High-grade aluminum alloy casting/forging flanges with EPDM or fluorosilicone dual O-rings, helium-leak-tested to ensure hermetic SF6 containment.
Enter your requirements and send them to our sales desk. If online sending is unavailable, you get an email draft instead.

Compare oil and dry-core construction, mounting, maintenance and model-specific IEC 60137 test evidence before choosing a transformer bushing.

Check oil and gas interfaces, sealing, wall penetration, insulation level and the applicable test plan against equipment drawings.